/Work Package 1. PROJECT MANAGEMENT

General & technical management, quality assurance, administrative coordination and reporting to EU Commission.

 

 

/Work Package 2. COMPUTER MODELLING

Computational validation of an experimental wind tunnel model and scalability study of the technology.

 

 

/Work Package 3. 4kw WIND GENERATOR OPTIMISATION

Aerodynamic and structure optimisation. Material selection.

 

 

/Work Package 4. 4kw ELECTRIC OPTIMISATION

Tuning system, electric generator, power converter and control optimisation. Technical report with mechanical and electric drawings.

 

 

/ Work Package 5. 4kw CERTIFICATION, HOMOLOGATION & DEMOSTRATION

Final design verification before the manufacturing of the 4kW device (5 units), intended to obtain certifications and homologations and to be installed for testing, commercial and demonstration activities.

 

 

/Work Package 6. COMMERCIALIZATION ACTIVITIES

Business plan development, incorporating a detailed commercialisation strategy and a financing plan in view of the next market launch. It will also include technology and market watch, as well as, intellectual property rights issues.

 

 

/Work Package 7. COMMUNICATION AND DISSEMINATION ACTIVITIES

Promotion of project outcomes, contributing to the appropriate exploitation of Vortex initiative.

 

 

Generation and carbon foot print reduction about 40%

53%

off IN MANuFACTURING COSTS.

51%

off in operating costs.

80%

off in maintenance costs.

40%

global power generation costs reduction.

40%

carbon foot print reduction.